Responsible to complete the foundation, which involved direct coordination with Amtrak as a result of the adjacency to the active tracks. Placed protective shields around active track and demolished overbuild over Amtrak tracks while track remained operational. In addition installed caissons 6 foot from the track on either side, placed foundations and 12' crashed walls.
Site conditions including removing rock on each site and worked alongside active tracks to install much of our work. Sties included installing deep wells to dewater and keep work area dry.
Worked on the west side of eleventh avenue adjacent to the LIRR-Amtrak Yard to complete the work.